Server
Unlock screen rotation for fullscreenThe Old Gotthard Tunnel Route - Driver's Eye View
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
- Genre:
- Documentary
- Duration:
- 112 min
- Cast:
- Jonathan Kydd
- Quality:
- HD
- Director:
- -
- Release:
- 2018
- Country:
- United Kingdom
- Rating:
- -

